The cost of participation – 1100 euro.
It includes:
1) Placement in the central hall on the first floor in Ukrainian House – stand of 4 square meters
Construction of an exhibition stand
 |
The standard furniture of an exhibition stand is as follows:
- Wall panels (2,5 ì – height)
- Signboard with exhibitor’s name
- Table
- 2 Chairs
- Spot Lamp
- Rubbish bin
- 220 V plug socket
|
2) information in the fair catalogue (up to 50 words, names and addresses, logo of participant)
3) 30 minutes Power Point Presentation.
4) Invitation for 2 persons to our evening cocktail event.
The cost of participation – 1500 EURO.
It includes:
1) Placement in the central hall on the first floor in Ukrainian House – stand of 6 square meters
Construction of an exhibition stand
 |
The standard furniture of an exhibition stand is as follows:
- Wall panels (2,5 ì – height)
- Signboard with exhibitor’s name
- 1 Counter (1000*500*700 mm)
- Table
- 2 Chairs
- 2 Spot Lamps
- Rubbish bin
- 220 V plug socket
|
2) information in the fair catalogue (up to 50 words, names and addresses, logo of participant)
3) 30 minutes Power Point Presentation.
4) Invitation for 2 persons to our evening cocktail event.
The cost of participation on 17 November in Lviv – 400 EURO.
It includes:
1) Placement in the central hall on the National University «Lviv Polytechnic»
Construction of an exhibition stand
 |
The standard furniture of an exhibition stand is as follows:
- Table
- 2 Chairs
- Rubbish bin
- 220 V plug socket
- Intercity transportation between Kiev and Lviv
|
Application form>>